The following are some of the pictures of Sungai Buloh MRT station during construction.
Come see a picture tour to check out how the Sungai Buloh MRT station was built from scratch.
📅 December 2016
The passenger layby at the Sungai Buloh Station.

The escalators and stairs at the concourse level of the Sungai Buloh Station.

📅 November 2016
View of the completed Sungai Buloh MRT Station with the common concourse with the Sungai Buloh KTM Station over the KTM tracks. Also seen is an MRT train undergoing testing.

📅 September 2016
View of the Sungai Buloh MRT Station (white roof) with the common concourse with the Sungai Buloh KTM Station (red roof)

View of the platform level of the Sungai Buloh MRT Station.

📅 June 2016
View of the completed common concourse linking both the Sungai Buloh MRT Station with the KTM Komuter Station.

Aerial view of the pedestrian entrance bridge that leads towards the entrance of the Sungai Buloh Station.

📅 May 2016
The MRT Sungai Buloh Station which is located next to the KTM train tracks.

The MRT Sungai Buloh Station (left) next to the KTM Sungai Buloh Station (right).

📅 April 2016
View of the train undergoing testing at the Sungai Buloh Station.

View of the Sungai Buloh MRT Station (left) located next to the KTM train tracks (right).

Aerial view of the pedestrian bridge connecting the Sungai Buloh KTM and MRT stations.

The escalators leading up to the MRT station from the KTM for commuters.

📅 March 2016
Construction at the concourse level of the Sungai Buloh Station in progress.

Ongoing works of the link between the Sungai Buloh KTM Komuter (left) and MRT Station (right).

📅 February 2016
Escalator being installed inside the Sungai Buloh Station.

Construction at the concourse level of the Sungai Buloh Station in progress.

📅 January 2016
The view from the Sungai Buloh KTM Station of the common concourse level being constructed.

View of the completed MRT guideway crossing over Jalan Kuala Selangor.

The common concourse of the Sungai Buloh KTM Station (red roof) and the Sungai Buloh MRT Station (left) taking shape.

View of the Sungai Buloh Station and the common concourse level of the station.

★ These pictures of Sungai Buloh MRT Station are of credits to Mass Rapid Transit Corporation Sdn Bhd and the original copies are available at MRT Corp official website.
MRT stations of MRT Kajang Line
The MRT Kajang line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT) that began full operations in July 2017.

The MRT Putrajaya alignment spans a total length of 57.7km, consisting of 44.2km of elevated tracks and 13.5km running through underground tunnels. It has 39 operational stations of which 30 stations are elevated stations and 9 underground stations.