The Metro Prima MRT station is a mass rapid transit (MRT) station that is built to serve the suburb of Metro Prima in Kepong, Kuala Lumpur.
The station is located along Jalan Kepong, next to its intersection with Jalan Metro Prima. The station primarily serves the Metro Prima commercial centre, hence the name.
There is an AEON Mall 160m southwest of the station.
The Metro Prima MRT station is one of the stations being built as part of the Klang Valley Mass Rapid Transit (KVMRT) project on the MRT Putrajaya Line.
It is scheduled to begin operations on 16 June 2022 as part of Phase One operations of the line.




✭ Want to see more pictures? Check out the pictures taken during the construction of Metro Prima MRT station.
Location
The Metro Prima MRT station is located along Jalan Kepong, next to its intersection with Jalan Metro Prima.


Facilities and services
The Metro Prima MRT station provides following facilities and services at the station for the convenience of the passengers.
- Feeder Bus
- Lift
- Escalator
- Public Toilets
- Surau
- Ticket Vending Machine
- Customer Service Office
- Park and Ride
- Island Platform





Disabled-friendly Facilities
The following disabled-friendly facilities can be found at the Metro Prima MRT station.
- Ramp access
- Tactile tiles
- Braille for the lift buttons
- Low counters for wheel chair users
- Low lift buttons for wheel chair users
- Disabled-friendly toilets
- Staff at stations to provide assistance
Station statistics
Metro Prima MRT station | |
---|---|
Location | Kepong, Kuala Lumpur, Malaysia |
Lines | MRT Putrajaya Line |
Structure | Elevated |
Platforms | 1 island platforms |
Tracks | 2 |
Parking | Available, paid parking |
Bicycle facilities |
Not applicable |
Opened | 16 June 2022 |
Owned by | Rapid Rail |
Reference | Metro Prima station on wikipedia |
MRT stations of MRT Putrajaya Line
The MRT Putrajaya Line is the second line of the KVMRT Project to be developed after the successful completion of first line — MRT Kajang Line in July 2017.

The MRT Putrajaya alignment will have a length of 57.7km, consisting of 44.2km of elevated tracks and 13.5km running through underground tunnels. It has 39 operational stations of which 30 are elevated and 9 underground. A further 4 stations have been provided for the future.