The Serdang Raya Utara MRT station is an elevated MRT station serving the suburb of Taman Serdang Raya and Taman Putra Indah in Selangor.

The Serdang Raya Utara MRT station is one of the stations being built as part of the Klang Valley Mass Rapid Transit (KVMRT) project on the MRT Putrajaya Line.
Stations for MRT Putrajaya Line |
---|
![]() |
↳ ![]() ![]() |
![]() |
![]() |
It started operations on March 16, 2023 as part of Phase Two operations of the MRT Putrajaya Line.








The Serdang Raya Utara MRT station is built in between Jalan Utama, Taman Serdang Raya, Seri Kembangan and North–South Expressway Southern Route. It is next to the Sungai Besi toll plaza.
Park N Ride facility is available at this station.
✭ Want to see more pictures? Check out more pictures taken during the construction of Serdang Raya Utara MRT station.
Location
The Serdang Raya Utara MRT station is located next to the Sungai Besi toll plaza, where the paid zone of the PLUS toll road begins.

Around this MRT station, you can find these nearby attractions within short walking distance.
- Aman Heights
- Burger King Plaza Serdang Raya
- Dream’s Love Cafe
- Fat One Kopitiam
- Mangga Boutique Hotel
- McDonald’s Shell Serdang Raya
- N Hibiscus Hotel
- One South Street Mall
- OYO Home 89595 Happy Studio Flexis One South
- Premier Times International Services Studios & Hotel
- Residensi Flora One South
- Serdang Business Hotel
- Serdang Skyvilla
- Serdang UPM Homestay
- Sg Besi Hotel
- Sungai Besi Toll Plaza Southbound
- Taman Putra Indah Serdang Raya
- Zayah Homestudio
- ZETA Residence
Note: This is an ongoing update. More places will be added soon.

Entrances and Exit
The Serdang Raya Utara MRT station has 2 entrances.


The entrance A is located along Jalan Utama Taman Serdang Raya and it provides access to the Park N Ride car park and Motorcycle parking bay, feeder bus stop and private vehicle lay-by.

The entrance B is located along Jalan OS (One South City). It provides access to the One South Street Mall, and South City.








Facilities and services
The Serdang Raya Utara MRT station provides following facilities and services at the station for the convenience of the passengers.
- Feeder Bus
- Lift
- Escalator
- Public Toilets
- Surau
- Ticket Vending Machine
- Customer Service Office
- Park and Ride
- Island Platform












Disabled-friendly Facilities
The following disabled-friendly facilities can be found at the Serdang Raya Utara MRT station.
- Ramp access
- Tactile tiles
- Braille for the lift buttons
- Low counters for wheel chair users
- Low lift buttons for wheel chair users
- Disabled-friendly toilets
- Staff at stations to provide assistance

Park and Ride
At the Serdang Raya Utara MRT station, a total of 243 car parking lots are available.
The Park and Ride facility at the Serdang Raya Utara MRT station is operated by Taha Meera Enterprise (+6017-2708900).

The parking rates for motorcycle is RM1.10 per entry per day at all Park and Ride.

Free first 15 minutes of parking charges (passing through) at all Park and Ride. Standard rates per hours will apply after 15 minutes for Non MRT user.

For Park and Ride user, please use the same Touch ‘n Go card for parking and train for RM4.30 per entry charge on the same day.


The same Touch ‘n Go card must be used on your return journey from the MRT Station to the Park and Ride.
You must leave the Park and Ride within 2 hours of exiting the MRT station fare gates.
Hourly parking rates per hour will apply if you re-enter and exit the same station without using the train.
If user park beyond 12.00 midnight, the “Maximum Per Day / Overnight Charges” will apply on top of previous daily charges.
Read more on Park and Ride facility at Serdang Raya Utara MRT station.
Station statistics
Serdang Raya Utara MRT station | |
---|---|
Location | Taman Serdang Raya, Seri Kembangan, Kuala Lumpur |
Lines | ![]() |
Structure | Elevated |
Platforms | 1 island platform |
Tracks | 2 |
Parking | Available |
Opened | 16 March 2023 |
Owned by | Rapid Rail |
Reference | Serdang Raya Utara MRT station on wikipedia |
MRT stations of MRT Putrajaya Line
The MRT Putrajaya Line is the second line of the KVMRT Project to be developed after the successful completion of first line —
MRT Kajang Line in July 2017.

The MRT Putrajaya alignment spans a total length of 57.7km, consisting of 44.2km of elevated tracks and 13.5km running through underground tunnels. It has 39 operational stations of which 30 stations are elevated stations and 9 underground stations.
Site Search
Did you find what you are looking for? Try out the enhanced Google Search: