The following are some of the pictures of Taman Tun Dr Ismail MRT station during construction.
Completed and fully operational Taman Tun Dr Ismail MRT Station. (Jan 2017)
Construction of Entrance B near completion at the Taman Tun Dr Ismail Station. (Dec 2016)
Entrance to the Taman Tun Dr Ismail Station almost ready. (Oct 2016)
View of the Taman Tun Dr Ismail Station concourse with the fare gates, stairs and escalators installed. (Oct 2016)
Roofing of the entrance of the Taman Tun Dr Ismail Station in progress. (Jul 2016)
Entrances structure works in progress at the Entrance A of Taman Tun Dr Ismail Station. (Apr 2016)
Locomotives transporting equipment on the completed guideway heading towards the Taman Tun Dr Ismail Station. (Apr 2016)
Aerial view of the Taman Tun Dr Ismail Station under construction. (Dec 2015)
Aerial view of the MRT guideway along Jalan Damansara. (Dec 2015)
Aerial view of the Taman Tun Dr Ismail Station under construction. (Oct 2015)
View of Taman Tun Dr Ismail Station from ground level. (Oct 2015)
Sound barriers being installed on the completed MRT guideway near the TTDI station. (Oct 2015)
Overview of stations for MRT Sungai Buloh – Kajang line
The MRT Sungai Buloh – Kajang line comprises 31 stations, with 7 stations located along a 9.5 kilometre underground railway system. The following is a simplified table showing the integrations and connections of MRT Sungai Buloh-Kajang line with other rail systems to complete the Greater KL / Klang Valley Integrated Transit System.
MRT Sungai Buloh-Kajang Line |
---|