The following are some of the pictures of Surian MRT station during construction.
View of the Surian MRT Station with the pedestrian bridge at Sunway Nexis (right) being constructed. (Dec 2016)
Aerial view of the MRT guideway with the construction of the Persiaran Mahagoni intersection underpass in progress. (Oct 2015)
Surian station under construction. (Oct 2015)
Surian station under construction. (Oct 2015)
Roof structure being installed at the Surian Station. (Oct 2015)
Noise barriers being installed near the Surian Station. (Oct 2015)
Noise barriers installed at the MRT guideway above the Persiaran Surian. (Sep 2016)
View of the completed Surian Station with its pedestrian link bridge to the adjacent buildings being constructed. (Sep 2016)
View of the construction of the Surian Station in progress. (Apr 2016)
Aerial view of the Surian Station. (Jan 2016)
Architectural works for the Surian Station being done. (Jan 2016)
Overview of stations for MRT Sungai Buloh – Kajang line
The MRT Sungai Buloh – Kajang line comprises 31 stations, with 7 stations located along a 9.5 kilometre underground railway system. The following is a simplified table showing the integrations and connections of MRT Sungai Buloh-Kajang line with other rail systems to complete the Greater KL / Klang Valley Integrated Transit System.