The following are some of the pictures of Sri Raya MRT station during construction.
View of the platform level of the Sri Raya Station. Apr 2017
Ongoing final steel works for the entrance at the Sri Raya Station. Apr 2017
Structural steel work at the entrance towards the Sri Raya Station. Mar 2017
View of the concourse level at the Sri Raya Station. Feb 2017
The lift that has been installed at the concourse level at the Sri Raya Station. Feb 2017
Structural steel work for the entrance at the Sri Raya Station. Feb 2017
Aerial view of the Sri Raya MRT Station. Jan 2017
Overview of stations for MRT Sungai Buloh – Kajang line
The MRT Sungai Buloh – Kajang line comprises 31 stations, with 7 stations located along a 9.5 kilometre underground railway system. The following is a simplified table showing the integrations and connections of MRT Sungai Buloh-Kajang line with other rail systems to complete the Greater KL / Klang Valley Integrated Transit System.
MRT Sungai Buloh-Kajang Line |
---|
