The following are some of the pictures of Semantan MRT station during construction.
Evening aerial view of the Semantan MRT Station. (Sep 2016)
Aerial view of the Semantan Station. (Aug 2016)
Aerial view of the Semantan Station. (Jul 2016)
Evening aerial view of the Semantan Station. (Jun 2016)
Entrance 2 of the Semantan Station under construction. (May 2016)
MRT trains undergoing tests at the Semantan Station. (May 2016)
Aerial view of the Semantan station, with Entrance 2 being built on the right. (Apr 2016)
Aerial view of the Semantan Station, with the entrance being built. (Jan 2016)
Aerial view of the Semantan Station. (Dec 2015)
View of the Semantan Station above Jalan Semantan. (Dec 2015)
Architectural works for the Semantan Station being done. (Dec 2015)
Staircases and escalators being built inside the Semantan Station. (Dec 2015)
The structure for the lift at the platfrom level of the Semantan Station. (Dec 2015)
Equipment being installed in the Semantan station. (Dec 2015)
Overview of stations for MRT Sungai Buloh – Kajang line
The MRT Sungai Buloh – Kajang line comprises 31 stations, with 7 stations located along a 9.5 kilometre underground railway system. The following is a simplified table showing the integrations and connections of MRT Sungai Buloh-Kajang line with other rail systems to complete the Greater KL / Klang Valley Integrated Transit System.