The following are some of the pictures of Pusat Bandar Damansara MRT station during construction.
View of the completed Pusat Bandar Damansara MRT Station with a MRT train undergoing testing. (Dec 2016)
Evening aerial view of the Pusat Bandar Damansara Station and the lay-bys for feeder buses, taxis and private cars to drop-off and pick-up MRT commuters. (Sep 2016)
The feeder bus layby of the Pusat Bandar Damansara Station undergoing final works. (Jul 2016)
View of the Pusat Bandar Damansara Station which is almost completed. (Mar 2016)
View of the escalator that is being built for access to the Pusat Bandar Damansara Station from Jalan Johar. (Mar 2016)
The view of the pedestrian bridge to gain access from Jalan Johar to the Pusat Bandar Damansara Station. (Mar 2016)
The escalators that lead up to the platform level of the Pusat Bandar Damansara Station. (Mar 2016)
The completed train tracks at the Pusat Bandar Damansara Station. (Mar 2016)
The roofing of the Pusat Bandar Damansara Station link bridge escalator linking the pedestrian walkway and entrance to the station. (Mar 2016)
Overview of stations for MRT Sungai Buloh – Kajang line
The MRT Sungai Buloh – Kajang line comprises 31 stations, with 7 stations located along a 9.5 kilometre underground railway system. The following is a simplified table showing the integrations and connections of MRT Sungai Buloh-Kajang line with other rail systems to complete the Greater KL / Klang Valley Integrated Transit System.
MRT Sungai Buloh-Kajang Line |
---|

Site Search
Did you find what you are looking for? Try out the enhanced Google Search:
(Visited 167 times, 1 visits today)