The following are some of the pictures of Phileo Damansara MRT station during construction.
Construction of exit ramp from the Phileo Damansara Station multi-storey park and ride parking facility. (Dec 2016)
Aerial view of the pedestrian link bridge at the Phileo Damansara Station over the Sprint Highway. (Dec 2016)
View of the Phileo Damansara MRT Station undergoing construction works. (Oct 2016)
The pedestrian link bridge heading out of the Phileo Damansara Station. (Oct 2016)
View of the concourse level with escalators already installed inside the station. (Oct 2016)
View of the platform level of the Phileo Damansara Station. (Oct 2016)
Construction at the Phileo Damansara Station in progress. (Jan 2016)
Architectural works for the Phileo Damansara Station being done. (Jan 2016)
Ongoing construction of Entrance A of the Phileo Damansara Station with pedestrian bridge over the SPRINT Highway. (Jan 2016)
Escalators at the Entrance A of the Station Phileo Damansara being installed. (Jan 2016)
Track works on the completed guideway along SPRINT Highway. (Sep 2015)
Ongoing track works near the Phileo Damansara Station. (Sep 2015)
View of the site for the Phileo Damansara Station multi-storey park and ride building. (Sep 2015)
View of the Phileo Damansara Station with the pedestrian bridge structure over the SPRINT Highway installed. (Sep 2015)
Overview of stations for MRT Sungai Buloh – Kajang line
The MRT Sungai Buloh – Kajang line comprises 31 stations, with 7 stations located along a 9.5 kilometre underground railway system. The following is a simplified table showing the integrations and connections of MRT Sungai Buloh-Kajang line with other rail systems to complete the Greater KL / Klang Valley Integrated Transit System.