The following are some of the pictures of Merdeka MRT station during construction.
📅 July 2017
Upper concourse level of the Merdeka station.
Upper concourse level of the Merdeka station.
Fare gates on lower concourse level.
Ticket vending machines on lower concourse level.
Text of Rukun Negara, the Malaysian national pledge, on upper concourse level.
Wall featuring text of text of Rukun Negara, the Malaysian national pledge, on upper concourse level.
Wall featuring Tunku Abdul Rahman, Malaysia’s first Prime Minister, declared the Federation of Malaya independent from the British Empire on 31 August 1957.
The ceiling above the escalator is decorated with 14-pointed star on the flag of Malaysia.
Motif showing an exploded view of the 14-pointed star on the flag of Malaysia.
Escalators between the upper and lower concourse level of the Merdeka station.
Escalator and stair access to train boarding platforms.
Train boarding platforms.
Platform 2: Sungai Buloh – Kajang Line towards Sungai Buloh.
Platform 1: Sungai Buloh – Kajang Line towards Kajang.
📅 April 2017
The station entrance of the Merdeka Station undergoing final works.
Final ongoing interior architectural works inside the Merdeka Station.
Final ongoing touches for the architectural works of the ceiling inside the Merdeka Station.
View of the completed Merdeka Station platform.
📅 February 2017
The customer service office that have been built inside the Merdeka Station.
Interior architectural wall works that is currently ongoing inside the Merdeka Station.
📅 January 2017
Aerial view of the Merdeka MRT Station and entrances to the station.
📅 December 2016
The escalators that have been installed inside the Merdeka Station.
Interior roofing works that is currently ongoing inside the Merdeka Station.
📅 October 2016
Entrances and ventilation buildings being built at the topside of the Merdeka Station.
Building services equipment such as air conditioning ducting already installed inside the Merdeka Station.
Entrances and ventilation buildings being built at the topside of the Merdeka Station.
View of the pedestrian linkway between the Merdeka Station and Plaza Rakyat LRT Station.
📅 Artist impression
Artist impression of Merdeka Station
★ These pictures of Merdeka MRT Station are of credits to Mass Rapid Transit Corporation Sdn Bhd and the original copies are available at MRT Corp official website.
MRT stations of MRT Kajang Line
The MRT Kajang line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT) that began full operations in July 2017.

The MRT Kajang Line spans a total length of 51km and it runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 30 stations of which 7 are underground station and 1 is provisional station (Bukit Kiara).
The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.
Stations for MRT Kajang Line | |
---|---|
![]() ![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() ![]() ![]() |
|
![]() ![]() ![]() |
|
![]() ![]() |
|
![]() ![]() |
|
![]() |
|
![]() ![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() ![]() |