The following are some of the pictures of Maluri MRT station during construction.
📅 July 2017
Arial view of Maluri MRT station and its suroundings.
Boarding Platform 1: Sungai Buloh – Kajang Line towards Kajang.
Boarding Platforms at Maluri MRT station.
Boarding Platform 2: Sungai Buloh – Kajang Line towards Sungai Buloh.
Concourse level of Maluri station.
Lighter, more playful decorative walls on concourse level of Maluri MRT station.
Concourse level of Maluri station.
Access gates and customer service office located on concourse level of Maluri station.
Lighter, more playful decorative walls on concourse level of Maluri station.
Escalators and stair for access to the ground level, heading towards Entrance A.
Concourse level of Maluri station.
Escalators and stair for access to the ground level.
Two entrances to the Maluri MRT station on both side of Jalan Cheras.
📅 April 2017
The Maluri Station entrance taking shape.
Toilet facilities inside the Maluri Station that is already ready.
Concourse level of the Maluri Station with integration of the ‘New Generation’ theme made visible on the walls.
Automated fare collection gates structure that has been installed inside the Maluri Station.
📅 February 2017
Platform screen doors that have been installed inside the Maluri Station.
View of the track cross-over, the only one for the underground section at the Maluri Station.
📅 December 2016
The completed crossover in the underground section at the Maluri Station.
The stairs and escalators that have been installed inside the Maluri Station.
📅 February 2016
View of the Adits B and C area of the station box of the Maluri Station.
View of the track crossover inside the Maluri Station.
📅 December 2015
View of the Adits B and C area of the station box.
📅 October 2015
View of the Adits B and C area of the station box.
📅 September 2015
Construction of the staircase from the platform level to the concourse level in progress.
Excavation in progress for Entrance A.
📅 May 2015
View of the station site, where the Roof Slab for the Adits B and C area is being constructed.
Roof Slab construction in progress.
Location of Entrance A where excavation work is in progress.
View of the metro decking (white slabs) over the station box used as a temporary road.
📅 Artist impression
Artist impression of Maluri station.
★ These pictures of Maluri MRT Station are of credits to Mass Rapid Transit Corporation Sdn Bhd and the original copies are available at MRT Corp official website.
MRT stations of MRT Kajang Line
The MRT Kajang line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT) that began full operations in July 2017.

The MRT Kajang Line spans a total length of 51km and it runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 30 stations of which 7 are underground station and 1 is provisional station (Bukit Kiara).
The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.
Stations for MRT Kajang Line | |
---|---|
![]() ![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() ![]() ![]() |
|
![]() ![]() ![]() |
|
![]() ![]() |
|
![]() ![]() |
|
![]() |
|
![]() ![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() ![]() |
Site Search
Did you find what you are looking for? Try out the enhanced Google Search: