The following are some of the pictures of Kota Damansara MRT station during construction.
An MRT train departs from the Kota Damansara MRT Station heading south. (Jan 2017)
The guideway heading out of the Kota Damansara Station with sound barriers installed. (Nov 2016)
View of the Kota Damansara Station. (Sep 2016)
Ongoing construction of the entrance of the Kota Damansara Station. (Jun 2016)
Tactile tiles being fitted at the Kota Damansara Station. (Jun 2016)
Final touches on the ticketing booth being done at the Kota Damanasara Station. (Jun 2016)
The escalators and stairs leading up to the platform level of the Kota Damansara Station almost ready. (Jun 2016)
A MRT train currently ongoing testing at the Kota Damansara station. (Jun 2016)
The chairs, big fans and platform screen doors already installed inside the Kota Damansara Station. (Jun 2016)
Overview of stations for MRT Sungai Buloh – Kajang line
The MRT Sungai Buloh – Kajang line comprises 31 stations, with 7 stations located along a 9.5 kilometre underground railway system. The following is a simplified table showing the integrations and connections of MRT Sungai Buloh-Kajang line with other rail systems to complete the Greater KL / Klang Valley Integrated Transit System.
MRT Sungai Buloh-Kajang Line |
---|