The following are some of the pictures of Batu 11 Cheras MRT station during construction.
Aerial view of the entrance to the Batu 11 Cheras Station. Apr 2017
Aerial view of the entrance to the Batu 11 Cheras MRT Station. Apr 2017
Station entrance with steel structure installation complete. Mar 2017
Escalator and stairs that have been fitted out inside the Batu 11 Cheras Station. Mar 2017
Station entrance with steel structure installation complete at the Batu 11 Cheras Station. Feb 2017
View of the Batu 11 Cheras Station with the walkway access. Jan 2017
Ongoing steel work of the entrance towards the Batu 11 Cheras Station. Jan 2017
Ongoing construction works at the platform level of the Batu Sebelas Cheras Station including the installation of platform screen doors. Jun 2016
View of the construction progress of the Batu Sebelas Cheras Station. May 2016
A close-up view of the roof covering installation works for the Batu Sebelas Cheras Station. Apr 2016
View of the Sungai Langat upgrading in progress near the Batu Sebelas Cheras Station. Apr 2016
Overview of stations for MRT Sungai Buloh – Kajang line
The MRT Sungai Buloh – Kajang line comprises 31 stations, with 7 stations located along a 9.5 kilometre underground railway system. The following is a simplified table showing the integrations and connections of MRT Sungai Buloh-Kajang line with other rail systems to complete the Greater KL / Klang Valley Integrated Transit System.