The following are some of the pictures of Bandar Utama MRT station during construction.
Aerial view of the Bandar Utama MRT Station. To its left is the 1Powerhouse building. (Sep 2016)
View of the Bandar Utama Station which is located in front of Seri Pentas and beside the 1PowerHouse Bandar Utama (right) that is currently undergoing construction. (Aug 2016)
View of the walkway being built to connect the Bandar Utama Station with its Multi Storey Park n Ride building. (Jun 2016)
View of the ongoing construction at the Bandar Utama Station with the multi storey car park. (Feb 2016)
Ongoing construction at the Bandar Utama Station. (Dec 2015)
Staircases and escalators being built inside the Bandar Utama Station. (Dec 2015)
View of the station roof structure being installed at the Bandar Utama Station. (Dec 2015)
View of the completed MRT guideway with tracks and noise barriers near the Bandar Utama Station. (Dec 2015)
An aerial view of the ongoing construction at the Bandar Utama station. (Oct 2015)
Ongoing construction at the Bandar Utama Station. (Aug 2015)
The private project which will house the multi-storey park and ride for the Bandar Utama Station. (Aug 2015)
The special span over the LDP between Bandar Utama and Taman Tun Dr Ismail. (Aug 2015)
The special span over the LDP between Bandar Utama and Taman Tun Dr Ismail. (Aug 2015)
Overview of stations for MRT Sungai Buloh – Kajang line
The MRT Sungai Buloh – Kajang line comprises 31 stations, with 7 stations located along a 9.5 kilometre underground railway system. The following is a simplified table showing the integrations and connections of MRT Sungai Buloh-Kajang line with other rail systems to complete the Greater KL / Klang Valley Integrated Transit System.
MRT Sungai Buloh-Kajang Line |
---|
