The following are some of the pictures of Bandar Utama MRT station during construction.
📅 September 2016
Aerial view of the Bandar Utama MRT Station. To its left is the 1Powerhouse building.
📅 August 2016
View of the Bandar Utama Station which is located in front of Seri Pentas and beside the 1PowerHouse Bandar Utama (right) that is currently undergoing construction.
📅 June 2016
View of the walkway being built to connect the Bandar Utama Station with its Multi Storey Park n Ride building.
📅 February 2016
View of the ongoing construction at the Bandar Utama Station with the multi storey car park.
📅 December 2015
Ongoing construction at the Bandar Utama Station.
Staircases and escalators being built inside the Bandar Utama Station.
View of the station roof structure being installed at the Bandar Utama Station.
View of the completed MRT guideway with tracks and noise barriers near the Bandar Utama Station.
📅 October 2015
An aerial view of the ongoing construction at the Bandar Utama station.
📅 August 2015
Ongoing construction at the Bandar Utama Station.
The private project which will house the multi-storey park and ride for the Bandar Utama Station.
The special span over the LDP between Bandar Utama and Taman Tun Dr Ismail.
The special span over the LDP between Bandar Utama and Taman Tun Dr Ismail.
★ These pictures of Bandar Utama MRT Station are of credits to Mass Rapid Transit Corporation Sdn Bhd and the original copies are available at MRT Corp official website.
MRT stations of MRT Kajang Line
The MRT Kajang line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT) that began full operations in July 2017.
The MRT Kajang Line spans a total length of 51km and it runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 30 stations of which 7 are underground station and 1 is provisional station (Bukit Kiara).
The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.
Stations for MRT Kajang Line | |
---|---|
KG04 Kwasa Damansara ⇄ PY01 Kwasa Damansara | |
KG05 Kwasa Sentral | |
KG06 Kota Damansara | |
KG07 Surian | |
KG08 Mutiara Damansara | |
KG09 Bandar Utama | |
KG10 Taman Tun Dr Ismail (TTDI) | |
KG12 Phileo Damansara | |
KG13 Pusat Bandar Damansara | |
KG14 Semantan | |
KG15 Muzium Negara ⇄ KJ15 KL Sentral ⇄ MR1 KL Sentral ⇄ KA01 KS01 KL Sentral ⇄ KT1 KE1 KL Sentral |
|
KG16 Pasar Seni ⇄ KJ14 Pasar Seni ⇄ KA02 Kuala Lumpur |
|
KG17 Merdeka ⇄ AG8 SP8 Plaza Rakyat |
|
KG18A Bukit Bintang ⇄ MR6 Bukit Bintang |
|
KG20 Tun Razak Exchange (TRX) ⇄ PY23 Tun Razak Exchange (TRX) |
|
KG21 Cochrane | |
KG22 Maluri ⇄ AG13 Maluri |
|
KG23 Taman Pertama | |
KG24 Taman Midah | |
KG25 Taman Mutiara | |
KG26 Taman Connaught | |
KG27 Taman Suntex | |
KG28 Sri Raya | |
KG29 Bandar Tun Hussein Onn | |
KG30 Batu 11 Cheras | |
KG31 Bukit Dukung | |
KG33 Sungai Jernih | |
KG34 Stadium Kajang | |
KG35 Kajang ⇄ KB06 Kajang |
Site Search
Did you find what you are looking for? Try out the enhanced Google Search: