Greetings! Are you looking for videos of klia2 taken in 2011?
The new Malaysian Airport, Kuala Lumpur International Airport 2 (klia2), is built to be Malaysia’s Next Generation International Airport Hub that allows seamless connectivity for both local and international low-cost & full-service carriers.

Officially opened on May 2, 2014, the klia2 is built to cater for the explosive growth in low-cost travel industry, capable of servicing 45 million passengers a year.
Facts and figures about klia2 terminal |
---|
Capacity to accommodate 45 million passengers per year |
257,000 m2 total area, 32,000 m2 retail space and shops |
6,000 car park lots |
Estimated total cost of RM4.0 Billion |
4Km Runway 3 with a 2.2km separation from Runway 2 |
Tallest Air Traffic Control Tower (ATCT) in region |
Skybridge spanning 300 meters long |
124 pax / m2 passenger comfort (capacity / floor space) |
klia2 2011 videos
We are the victims, claims AirAsia Malaysia (klia2)
Local low-cost carrier AirAsia today claimed that it is the “victim” in the ongoing tiff with Malaysian Airports Holdings Bhd (MAHB) over the construction of the new klia2 low-cost air terminal. This video was uploaded on 6 Dec 2011
Air Asia: Unhappy with upgrade of klia2
Top management of low-cost carrier AirAsia Bhd. expressed their unhappiness over the lack of consultation over the controversial upgrade of the low cost air terminal klia2. This video was uploaded on 6 Dec 2011
KLIA 2 Artist Impression
This video was uploaded on 10 Jan 2011
Site Search
Did you find what you are looking for? Try out the enhanced Google Search: