Greetings! Are you looking for videos of klia2 taken in 2010?
The new Malaysian Airport, Kuala Lumpur International Airport 2 (klia2), is built to be Malaysia’s Next Generation International Airport Hub that allows seamless connectivity for both local and international low-cost & full-service carriers.

Officially opened on May 2, 2014, the klia2 is built to cater for the explosive growth in low-cost travel industry, capable of servicing 45 million passengers a year.
Facts and figures about klia2 terminal |
---|
Capacity to accommodate 45 million passengers per year |
257,000 m2 total area, 32,000 m2 retail space and shops |
6,000 car park lots |
Estimated total cost of RM4.0 Billion |
4Km Runway 3 with a 2.2km separation from Runway 2 |
Tallest Air Traffic Control Tower (ATCT) in region |
Skybridge spanning 300 meters long |
124 pax / m2 passenger comfort (capacity / floor space) |
klia2 2010 videos
KLIA 2 – Ground Breaking 30th August 2010
This video was uploaded on 21 Oct 2010.
KLIA Terminal 2
This video was uploaded on 20 Oct 2010.
PM: Malaysia to have world’s first mega low cost carrier terminal
Prime Minister Datuk Seri Najib Tun Razak says Malaysia will have the world’s first mega low cost carrier terminal known as KLIA2 and is scheduled to be completed in 2012. This video was uploaded on 30 Aug 2010.
Site Search
Did you find what you are looking for? Try out the enhanced Google Search: