Greetings! Here is the gallery 7 of work in progress pictures taken during the construction of the Kuala Lumpur International Airport Terminal 2 (klia2) for your review!
The new Malaysian Airport, Kuala Lumpur International Airport 2 (klia2), is built to be Malaysia’s Next Generation International Airport Hub that allows seamless connectivity for both local and international low-cost & full-service carriers.
The klia2 terminal is officially opened on May 2, 2014.
Facts and figures about klia2 terminal |
---|
Capacity to accommodate 45 million passengers per year |
257,000 m2 total area, 32,000 m2 retail space and shops |
6,000 car park lots |
Estimated total cost of RM4.0 Billion |
4Km Runway 3 with a 2.2km separation from Runway 2 |
Tallest Air Traffic Control Tower (ATCT) in region |
Skybridge spanning 300 meters long |
124 pax / m2 passenger comfort (capacity / floor space) |
Construction pictures of klia2 terminal (Jul 2013 to Aug 2013)

klia2 as of 12 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 13 July 2013

klia2 as of 18 July 2013

klia2 as of 18 July 2013

klia2 as of 29 July 2013

klia2 as of 31 July 2013

klia2 as of 31 July 2013

klia2 as of 31 July 2013

klia2 as of 19 August 2013

klia2 as of 19 August 2013

klia2 as of 19 August 2013

klia2 as of 19 August 2013

klia2 as of 19 August 2013

klia2 as of 19 August 2013

klia2 as of 19 August 2013

klia2 as of 20 August 2013

klia2 as of 20 August 2013

klia2 as of 20 August 2013

klia2 as of 20 August 2013

klia2 as of 20 August 2013

klia2 as of 20 August 2013

klia2 as of 20 August 2013

klia2 as of 20 August 2013

klia2 as of 27 August 2013

klia2 as of 27 August 2013

klia2 as of 27 August 2013

klia2 as of 27 August 2013
Note: This Gallery 7 of work in progress pictures are taken online and the copyrights belong to the respective parties.