Greetings! Here is the gallery 6 of work in progress pictures taken during the construction of the Kuala Lumpur International Airport Terminal 2 (klia2) for your review!
The new Malaysian Airport, Kuala Lumpur International Airport 2 (klia2), is built to be Malaysia’s Next Generation International Airport Hub that allows seamless connectivity for both local and international low-cost & full-service carriers.
The klia2 terminal is officially opened on May 2, 2014.
Facts and figures about klia2 terminal |
---|
Capacity to accommodate 45 million passengers per year |
257,000 m2 total area, 32,000 m2 retail space and shops |
6,000 car park lots |
Estimated total cost of RM4.0 Billion |
4Km Runway 3 with a 2.2km separation from Runway 2 |
Tallest Air Traffic Control Tower (ATCT) in region |
Skybridge spanning 300 meters long |
124 pax / m2 passenger comfort (capacity / floor space) |
Construction pictures of klia2 terminal (Mar 2013 to Jul 2013)
























fairul says:
This was taken on the 7th April 2013. Obviously the contractors are working to complete the aprons/taxiway system facing the current RWY14R. This might be an indicator that it will be partially open on June 28.
1. the runway / taxiway system for the new RWY 14R/32L are not fully paved yet, few more layers needed.
2. one side of the apron at the domestic pier are complete. The other side concrete have yet being laid.
3. still no sign of aerobridge being installed at the completed apron at domestic pier. Only the hammerheads are complete.












































Note: This Gallery 6 of work in progress pictures are taken online and the copyrights belong to the respective parties.