Gateway@KLIA2

Key highlights


  • Transportation hub on level 1
  • Green building with Leadership in Energy & Environmental Design (LEED) certified
  • 350,000 sq ft of Malaysian sights and sounds to welcome you
  • Over 90 outlets of 24-hour F&B outlets to satisfy your cravings for local food
  • Shop for gifts to bring home in more than 110 outlets
  • Relaxation zone on level 2M
  • Express Rail Link (ERL) on Level 2


Services

  • Bureau De Change (BDC) / Money Changer
  • Luggage storage service
  • Loan of wheelchair
  • Loan of baby stroller
  • Concierge
  • Lost and found
  • 6,000 car park bays
  • Mobile concierge
  • Check-in kiosk
  • Valet parking
  • Car rental
  • Plaza Premium Lounge
  • Supermarket in an airport mall



Facilities:

  • Flight information display system (FIDS)
  • Public information display system (PIDS)
  • Airport trolley
  • Automated teller machine (ATM)
  • Travelator and Lifts
  • First aid room
  • 10 baby care rooms
  • Prayer room
  • Public phone
  • Toilets for the disabled
  • Container sleeping facilities

 

Proposed Facilities for KLIA2

Based on airlines requests:

  • 45 million passenger capacity
  • 68 contact stands
  • 8 remote stands
  • Substantially enhanced comfort level
  • Fully-automated BHS (Baggage Handling System)
  • 4Km runway with a 2.2Km separation from
    Runway 2
  • Provision for A380 operations
  • Tune Hotel
  • Air Transit Hotel
  • Premium lounges
  • AirAsia Head Office with apron access
  • AirAsia staff multi level parking
  • Hub for public transport for ERL, taxis, buses,
    and KTM (in future)

Based on regulatory requests:

  • Total international passenger arrival and departure segregation
  • No walking on apron
  • New ATC Tower for Runway 3 and future Runway 4 and backup for existing Runway 2

Based on public requests:

  • Aerobridges


Other requests:

  • Additional commercial area
  • Public shopping mall
  • Provisions for 4 hotels
  • VIP lounge
  • LEED Green Building Certification - Gold Award

 


Big Expansion of KLIA2 Infrastructure

3 Levels Terminal

Bigger KLIA2, superior facilities


Increased Footprint

Comparison: Original Design (2009) vs. Current Design (2011)

Bigger KLIA2, bigger area




 

Big Expansion of KLIA2 Specifications

Items Provisional
(Feb' 2009)
RM 2.0 Billion
Revised
RM 3.6 - 3.9 Billion
Increase in Scope
(%)
Terminal Building GFA - 150,000 m2 GFA - 257,000 m2 71.3%
Aircraft Stands Area - 500,000 m2
50 semi contact stands
Area - 803,709 m2
68 gates & 8 remote stands
(80 aerobridges)
60.7%
Earthworks Area - 4.85 mil m2 Area - 11.19 mil m2 130.7%
Runway 3, Taxiway
Pavement & AGL System
Code C
Length: 2.50 km
Width: 45 m
Code E
Length: 3.96 km
Width: 60 m
64.7% (Area)
DCA Facilities Apron Control Tower
Height: 77 m
Air Traffic Control Tower
Height: 93 m
20.8% (Height)
115.4% (Nav. Aids)
Public Infrastructure Length : 8 km
with 1.5 km elevated road
Length : 15 km
with 5.4 km elevated road
87.5%
260.0%



 

KLIA Overall Traffic - Actual & Forecast

Bigger KLIA2, Actual and forecast travellers

Operational Statistics

Year Passenger
movements
Cargo Handled
(tonnes)
Aircraft
movements
1998 6,524,405 156,641 64,123
1999 13,172,635 417,068 116,589
2000 14,732,876 510,594 109,925
2001 14,538,831 440,864 113,590
2002 16,398,230 527,124 127,952
2003 17,454,564 586,195 139,590
2004 21,058,572 651,747 164,483
2005 23,213,926 653,654 182,537
2006 24,570,385 677,446 183,869
2007 26,938,970 649,197 193,982
2008 27,529,355 667,495 209,681
2009 29,682,093 601,620 225,251
2010 34,087,636 697,015 244,179
2011 37,704,510 669,849 269,509
2012 39,887,866 673,107 283,352

Source: en.wikipedia.org.

 

Airport Tax

International passengers travelling through Kuala Lumpur International Airport (KLIA) have to pay RM65 as airport tax while the domestic charge remains at RM9.

The airport tax for international travellers at low-cost carrier terminals (LCCT) has been increased to RM32 from RM25. Domestic flyers need to pay RM6.

Source: theborneopost.com

15 November, 2013
The finalised passenger service charges (PSC) or airport taxes for Kuala Lumpur International Airport 2 (KLIA2) will be made public by end of this year, Read more on Airport taxes at KLIA2 to be announced by year-end.

19 August, 2013
The passenger service charge (PSC) at KLIA2 will be the same as the low-cost carrier terminal (LCCT), said Deputy Transport Minister Datuk Aziz Kaprawi. Read more on Aziz Kaprawi: No increase in passenger service charge at KLIA2.

 

Comparison of KLIA, LCCT, and KLIA2

  KLIA LCCT KLIA2
Capacity
(passengers per year)
25 million 15 million 45 million
Terminal size (sqm) 479,404 64,067 257,000
Retail space (sqm) 19,425 8,898 32,000 (estimated)
Car park (lots) 6,208 (covered lots)
5,509 (uncovered lots)
3,000 (uncovered lots)
See expansion
6,000
Cost (RM billion) about 10.0 0.3 (terminal cost only) 3.6 - 3.9 (latest estimate)
Runway access Runway 1 and 2 at KLIA Runway 1 and 2 at KLIA 4Km runway with
a 2.2Km separation
from Runway 2
Passenger comfort
(capacity / floor space)
52 pax per sqm 234 pax per sqm 124 pax per sqm

 

Check out all the facilities

 

Further Reading