The new Malaysian Airport, Kuala Lumpur International Airport 2 (klia2), is built to be Malaysia’s Next Generation International Airport Hub that allows seamless connectivity for both local and international low-cost & full-service carriers. Officially opened on May 2, 2014, the klia2 is built to cater for the explosive growth in low-cost travel industry, capable of servicing 45 million passengers a year.
Facts and figures about klia2 terminal |
---|
Capacity to accommodate 45 million passengers per year |
257,000 m2 total area, 32,000 m2 retail space and shops |
6,000 car park lots |
Estimated total cost of RM4.0 Billion |
4Km Runway 3 with a 2.2km separation from Runway 2 |
Tallest Air Traffic Control Tower (ATCT) in region |
Skybridge spanning 300 meters long |
124 pax / m2 passenger comfort (capacity / floor space) |
klia2 is ready, gallery 3






















































Photo Credits
All the pictures displayed on this page are of the copyrights of the respective owners. These pictures were taken by Cecil Lee, Adam Lee, and Greater Kuala Lumpur Development & Construction. If you want your picture to be removed from this page, please leave us a message at klia2@Facebook, and we will attend to you as soon as possible.
Site Search
Did you find what you are looking for? Try out the enhanced Google Search: