The following are some of the pictures of Pasar Seni MRT station during construction.
📅 July 2017
Escalators and staircase access to the concourse level.
Platform 1: Sungai Buloh – Kajang Line towards Kajang.
Platform 2: Sungai Buloh – Kajang Line towards Sungai Buloh.
Concourse level of the Pasar Seni station.
Concourse level of the Pasar Seni station.
Concourse level of the Pasar Seni station.
Staircase and escalator access to the train boarding platforms.
Staircase and escalator access to the train boarding platforms.
📅 April 2017
Aerial view of ongoing landscaping works at the Pasar Seni Station site.
View of the pedestrian link bridge connecting the MRT and KTM Pasar Seni Stations undergoing construction.
The concourse level of the Pasar Seni MRT station with automated vending machines and customer service office already built.
An MRT train undergoing testing inside the Pasar Seni MRT Station.
📅 March 2017
Hoardings that have been put up at the Pasar Seni KTM Station ticketing area as ongoing works of the link to the MRT Station is being built.
Ongoing roofing works of the Pasar Seni MRT Station.
The pedestrian linkway between the KTM and MRT Pasar Seni Stations.
Platform screen doors that have been installed inside the Pasar Seni MRT Station.
📅 February 2017
The pedestrian linkway between the LRT and MRT Stations being built at Pasar Seni.
Interior architectural wall works that is currently ongoing inside the Pasar Seni Station.
📅 January 2017
Aerial view of Pasar Seni MRT Station and its surrounding.
Entrance of the Pasar Seni MRT Station. The Pasar Seni LRT station is within sight.
Pedestrian walkway near Pasar Seni MRT Station.
Pedestrian walkway leading to the entrance of Pasar Seni MRT Station.
Entrance of the Pasar Seni MRT Station.
View of surrounding areas from Pasar Seni station.
View of surrounding areas from Pasar Seni station.
📅 November 2016
The linkway between the Pasar Seni MRT Station and the Pasar Seni LRT Station being constructed.
The stairs and escalator structure that have been fitted out inside the Pasar Seni Station.
📅 Artist impression
Artist impression of Pasar Seni MRT Station.
★ These pictures of Pasar Seni MRT Station are of credits to Mass Rapid Transit Corporation Sdn Bhd and the original copies are available at MRT Corp official website.
MRT stations of MRT Kajang Line
The MRT Kajang line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT) that began full operations in July 2017.
The MRT Kajang Line spans a total length of 51km and it runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 30 stations of which 7 are underground station and 1 is provisional station (Bukit Kiara).
The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.
Stations for MRT Kajang Line | |
---|---|
KG04 Kwasa Damansara ⇄ PY01 Kwasa Damansara | |
KG05 Kwasa Sentral | |
KG06 Kota Damansara | |
KG07 Surian | |
KG08 Mutiara Damansara | |
KG09 Bandar Utama | |
KG10 Taman Tun Dr Ismail (TTDI) | |
KG12 Phileo Damansara | |
KG13 Pusat Bandar Damansara | |
KG14 Semantan | |
KG15 Muzium Negara ⇄ KJ15 KL Sentral ⇄ MR1 KL Sentral ⇄ KA01 KS01 KL Sentral ⇄ KT1 KE1 KL Sentral |
|
KG16 Pasar Seni ⇄ KJ14 Pasar Seni ⇄ KA02 Kuala Lumpur |
|
KG17 Merdeka ⇄ AG8 SP8 Plaza Rakyat |
|
KG18A Bukit Bintang ⇄ MR6 Bukit Bintang |
|
KG20 Tun Razak Exchange (TRX) ⇄ PY23 Tun Razak Exchange (TRX) |
|
KG21 Cochrane | |
KG22 Maluri ⇄ AG13 Maluri |
|
KG23 Taman Pertama | |
KG24 Taman Midah | |
KG25 Taman Mutiara | |
KG26 Taman Connaught | |
KG27 Taman Suntex | |
KG28 Sri Raya | |
KG29 Bandar Tun Hussein Onn | |
KG30 Batu 11 Cheras | |
KG31 Bukit Dukung | |
KG33 Sungai Jernih | |
KG34 Stadium Kajang | |
KG35 Kajang ⇄ KB06 Kajang |
Site Search
Did you find what you are looking for? Try out the enhanced Google Search: