The following are some of the pictures of Bukit Bintang MRT station during construction.
📅 July 2017
Entrance E of Bukit Bintang MRT station near the Wolo Hotel.
Entrance D of Bukit Bintang station, near Lot 10 shopping mall.
Customer service booth at concourse level of Bukit Bintang station.
Dynamic Theme, chosen to represent the dynamic and exciting elements of the country’s top central business district, is reflected with different tones of red on the walls in the interior of the station that suggest movements.
Concourse level of the Bukit Bintang station.
Concourse level of the Bukit Bintang station.
Train boarding platform level at Bukit Bintang station.
Escalators to Platform 2 at Bukit Bintang station.
Escalator access between the concourse & platform levels.
📅 April 2017
Final ongoing works to one of the entrances at the Bukit Bintang MRT Station.
Final interior works to the walls of the Bukit Bintang MRT Station that depicts the ‘Dynamic’ theme.
📅 February 2017
Ongoing works at Entrance D of the Bukit Bintang Station.
Platform screen doors that have been installed inside the Bukit Bintang Station.
📅 January 2017
Work of the entrance of station under construction.
Work of the entrance of station under construction.
Work of the entrance of station under construction.
Work of the entrance of station under construction.
Entrance A of the Bukit Bintang Station beside KFC.
📅 December 2016
Ongoing works at Entrance D (left) and Entrance E (right) to the Bukit Bintang Station.
The escalators that have been installed inside the Bukit Bintang Station.
📅 October 2016
View of the topside of the Bukit Bintang Station with its entrance and ventilation building under construction.
Construction of Entrance A of the Bukit Bintang Station beside KFC in progress.
Construction of Entrance F of the Bukit Bintang Station in front of McDonalds in progress.
Work in progress at the platform level of the Bukit Bintang Station.
📅 Artist impression
Artist impression of Bukit Bintang station.
★ These pictures of Bukit Bintang MRT Station are of credits to Mass Rapid Transit Corporation Sdn Bhd and the original copies are available at MRT Corp official website.
MRT stations of MRT Kajang Line
The MRT Kajang line is the first line of the Klang Valley Mass Rapid Transit Project (KVMRT) that began full operations in July 2017.
The MRT Kajang Line spans a total length of 51km and it runs underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line has 30 stations of which 7 are underground station and 1 is provisional station (Bukit Kiara).
The following is a simplified table showing the integrations and connections of MRT Kajang Line with other rail systems to complete the Greater Kuala Lumpur / Klang Valley Integrated Transit System.
Stations for MRT Kajang Line | |
---|---|
KG04 Kwasa Damansara ⇄ PY01 Kwasa Damansara | |
KG05 Kwasa Sentral | |
KG06 Kota Damansara | |
KG07 Surian | |
KG08 Mutiara Damansara | |
KG09 Bandar Utama | |
KG10 Taman Tun Dr Ismail (TTDI) | |
KG12 Phileo Damansara | |
KG13 Pusat Bandar Damansara | |
KG14 Semantan | |
KG15 Muzium Negara ⇄ KJ15 KL Sentral ⇄ MR1 KL Sentral ⇄ KA01 KS01 KL Sentral ⇄ KT1 KE1 KL Sentral |
|
KG16 Pasar Seni ⇄ KJ14 Pasar Seni ⇄ KA02 Kuala Lumpur |
|
KG17 Merdeka ⇄ AG8 SP8 Plaza Rakyat |
|
KG18A Bukit Bintang ⇄ MR6 Bukit Bintang |
|
KG20 Tun Razak Exchange (TRX) ⇄ PY23 Tun Razak Exchange (TRX) |
|
KG21 Cochrane | |
KG22 Maluri ⇄ AG13 Maluri |
|
KG23 Taman Pertama | |
KG24 Taman Midah | |
KG25 Taman Mutiara | |
KG26 Taman Connaught | |
KG27 Taman Suntex | |
KG28 Sri Raya | |
KG29 Bandar Tun Hussein Onn | |
KG30 Batu 11 Cheras | |
KG31 Bukit Dukung | |
KG33 Sungai Jernih | |
KG34 Stadium Kajang | |
KG35 Kajang ⇄ KB06 Kajang |
Site Search
Did you find what you are looking for? Try out the enhanced Google Search: