About KLIA2
Capacity to accommodate 45 million passengers per year
257,000 m2 total area
32,000 m2 retail space and shops
6,000 car park lots
Estimated total cost of RM4.0 Billion
4Km Runway 3 with a 2.2km separation from Runway 2
Tallest Air Traffic Control Tower (ATCT) in region
Skybridge spanning 300 meters long
124 pax / m2 passenger comfort (capacity / floor space)
Transportation guide to KLIA2
Operational on 2 May 2014
Read the latest news.





 

KLIA2 2014 videos

KLIA2

Published on 28 May 2014 by Ayzek Azimov
A leisure walk at the KLIA2.

 

Kuala Lumpur International Airport KLIA2

Published on 16 May 2014
Destined to be a global benchmark, Kuala Lumpur International Airport KLIA2 embodies the concept of the 'Next Generation Hub' that will ease connectivity between full service carriers and low cost carriers. It will be the only dedicated mega terminal in the world that caters for the fast growing low carrier industry in this region. klia2 is designed with flexibility in mind to allow expandability for future growth trends and operational models of airlines. It robustness in nature will no doubt be able to accommodate the ever-evolving and dynamic global aviation industry.

 

Smooth sailing at KLIA2

Published on 9 May 2014
KLIA2 went into operation in full capacity smoothly on Friday with AirAsia officially began its operation at the new terminal.

 

LCCT akhiri perkhidmatan dengan penerbangan ke Jeddah

Published on 9 May 2014
Terminal Penerbangan Tambang Murah (LCCT) di Sepang hari ini mengakhiri perkhidmatannya setelah lapan tahun beroperasi dengan pelepasan pesawat AirAsiaX D7 170, ke Jeddah, Arab Saudi pada pukul 2.35 pagi ini. Sebelum itu, pesawat AirAsia AK 63, melakukan penerbangan terakhir untuk malam tadi dari terminal berkenaan ke Kolkata, India pada pukul 10.30 malam.

 

EXPRESS RAIL LINK in between LCC KLIA2 and KLIA

Published on 28 Apr 2014
In conjunction with KLIA2 open day on 27th APRIL 2014. Managed to shot this far view of ERL service. Sorry for the shaky and noise. KLIA2 is solely dedicated to emerging low cost airlines especially in Asia region. The airlines here are the Tiger airways, Cebu pacific, Mandala airways, Malaysia Malindo and of course biggest AIRASIA will be commencing their flight through here. KLIA2 is just next to KLIA (2km), making the whole KL airport to be the first in the region with 3 runaways. The 3rd aerobridge in world and the TALLEST ATC tower in the world.

 

KLIA 2 - Open Day

Published on 27 Apr 2014
KLIA 2 Open Day, April 27th 2014. The KLIA2 terminal is scheduled to open on 2 May 2014. Song Credit: Thomas Bergersen - Immortal

 

A ride to KLIA2

Published on 27 Apr 2014
5 days before official opening of KLIA 2

 

Malaysia Airlines B747 MH5402 landed safely in KLIA2 runway 3

Published on 24 Apr 2014
DS HishammuddinH2O cleared MH5402 for landing at Runway 3 from the ATCT Tower West : The handing over of Tower West is another milestone en route to the operationalisation of KLIA2 scheduled for 2nd May as promised.

 

ERL to KLIA2 to commence on May 2

Published on 21 Apr 2014
The Express Rail Link from KL Sentral to KLIA2 will commence operations when the airport terminal opens to the public on May 2.

 

KLIA2 ready for take off

Published on 16 Apr 2014
Malaysian Airport's Senior General Manager Dato' Azmi Murad provides a glimpse inside KLIA2 termina,l which is set to begin operations on May 2nd.

 

KLIA2 is 98% completed

Published on 7 Jan 2014
Acting Transport Minister Datuk Seri Hishammuddin Hussein says KLIA2 is expected to be operational on May 2.

 

 

KLIA2 videos